Rye Planning Commish Tuesday: Sub-Division, Undeveloped Lot Getting House, Pier Install & More

The planning commission is Tuesday, June 17, 2018. We've got items including a sub-division, an undeveloped lot getting a house and a pier install.

Anything else catch your eye? Submit a comment below.

RYE CITY PLANNING COMMISSION July 17, 2018 at 7:00 PM
Held in the City Council Hearing Room of the Rye City Hall

I. HEARINGS

280 Purchase Street Rye NY

1. 280 Purchase Street (Continued from June 19, 2018)
Required Approval(s): Site Plan (SP#367)
Location: 280 Purchase Street, Sheet 139.19, Block 3, Lot(s) 5.2
Applicant: Rocco Lagana
Project Description: Construction of two new commercial buildings with two apartments on the second floor of each building.

2 Warriston Lane Rye NY

2. 2 Warriston Lane
Required Approval(s): Wetland Permit (WP#441)
Location: 2 Warriston Lane, Sheet 153.15, Block 1, Lot(s) 6
Applicant: Mr. Damon Ball
Project Description: Replace 4” storm water overflow line and one dry well and connect to City catch basin in Forest Avenue.

ll. ITEMS PENDING ACTION

1. 280 Purchase Street
See Description Above

2. 2 Warriston Lane
See Description Above

3 club road rye ny 1

(PHOTO: Subdividing a four acre property at 3 Club Road on the Apawamis course into three development lots.)

3. 3 Club Road – Extension of Time
Required Approval(s): Subdivision (SUB#347)
Location: 3 Club Road, Sheet 146.6, Block 1, Lot(s) 12.1
Applicant: Steven Hash
Project Description: Subdivision of existing lot into three zoning-compliant lots for single-family residential development.

6 Hannan Place Rye NY

4. 6 Hannan Place
Required Approval(s): Wetland Permit (WP#438)
Location: 6 Hannan Place, Sheet 152.12, Block 1, Lot(s) 1.7
Applicant: Adam & Eva Cole
Project Description: Addition of a wood deck with partial roof on the rear of the existing house.

Summit Ave Rye NY

5. Summit Avenue
Required Approval(s): Wetland Permit (WP#440)
Location: Summit Avenue, Sheet 146.10, Block 1, Lot(s) 19
Applicant: Mr. Joseph P. Mutino
Project Description: Construction of a single-family home on an undeveloped lot at the end of Summit Avenue.

4 sacket landing rye ny

(PHOTO: Adding a pier at 4 Sacket Landing.)

6. 4 Sackett Landing
Required Approval(s): Wetland Permit (WP#444)
Location: 4 Sackett Landing, Sheet 147.5, Block 1, Lot(s) 5.3
Applicant: James Reddoch/Osprey Point Properties LLC
Project Description: Installation of a 4’ x 30’ pile-supported fixed steel pier with timber railing and decking, aluminum gangway, floating dock, and associated improvements. 

7. Minutes

 

 

 

 

RELATED ARTICLES

Leave a Reply

Your email address will not be published. Required fields are marked *