Rye Capital Improvements Project Name: City Hall – Hanging Ceiling Replacement
The news cycle is pretty slow here is Rye in August…
So we thought we'd profile some of the 55 projects on Rye City's capital improvement plan. These are projects (not a budget) of costs greater than $15,000 that are on a recommended plan for the 2015 – 2019+ time horizon.
Read the entire plan (starting on page 4) or tell us what you thing of the various projects are we profile them:
Project Name: City Hall – Hanging Ceiling Replacement
Project Type: Building
Department: Public Works
Project Priority: Moderate
Project Start Date: 2016
Project End Date: 2016
Project Description:
The project calls for the replacement of hanging ceiling tiles throughout City Hall. The ceiling was originally installed in 1964 and, over time, has shifted. Tiles are cracked or have fallen.
Estimated Project Costs:
Construction $75,000
Total $75,000
Funding Availability
2016 General Revenues $75,000
Project Need/Issues:
The existing 50-year-old ceiling is in a deteriorated condition and is difficult to maintain. The project has been deferred since 2009. The Ceiling would be replaced before the floor is replaced (2017).
Operating Cost Considerations:
No significant operational costs are anticipated.